MetroTop Corporate Campus – MetroPark NJ

  • Client – MetroTop Plaza Associates and Desman Assoc. (Engineer)

RTI was retained to perform a full restoration of the existing precast parking structure included full and partial depth concrete repairs. Reinforcing of structural support members, epoxy injection of cracks and the installation of a vehicular waterproofing membrane.

Add complete joint sealant replacement on Building 1 including repointing of failed stone joints. Building II although new construction still had leak remediation from construction defects that were solved as well as bird proofing of the exterior ledges with FlexShock Track.